Defence & Industrial Manufacturing Central Europe 12 weeks

Management information system at a defence manufacturer, built in 3 months with an AI coding agent

A European defence manufacturer replaced a stalled 12-month MIS programme with a Skygena engagement led by an AI coding agent. Three months after kickoff, 272 reporting requirements across four business domains were in production and the manual reporting FTE was gone.

The challenge

The group had a backlog of 272 formally scoped reporting requirements across production, quality, finance and HR. The traditional IT programme to build the management information system had a 12-month horizon and was being overtaken by its own change requests before the first release. Meanwhile the controlling team was hand-rolling the same reports every month — a 0.5 FTE job that mostly consisted of reconciling the same four source systems the MIS was supposed to unify.

The solution

We ran the build as an AI-coding-agent engagement from day one. Two senior Skygena engineers paired with a coding agent to turn the requirements catalogue — written in the controlling team's language — into generated, reviewed and tested code. We locked the data model first (four domains, one governed semantic layer, row-level permissions), then let the agent generate connectors, transformations and report endpoints in parallel. Every generated unit went through a two-stage review — a second agent plus one of our engineers — before it merged. Reports were released in weekly cohorts, so the controlling team was validating real numbers from week three, not from month ten.

A requirements catalogue was the asset, not the liability

The group already knew what it wanted. The 272 requirements were crisp, owner-signed and, crucially, written in the controlling team’s language rather than in BI speak. In a traditional build, that catalogue becomes the thing you argue with for a year. In an agent-led build, it becomes the specification the agent codes against — and then validates its own output against, report by report.

The semantic layer first, the agent second

Before a single report was generated we spent three weeks with the controlling team hard-coding the metric definitions — revenue by site, gross margin by product family, OTIF, defect rate, headcount cost by department. Four domains, one semantic layer, row-level permissions baked in. The agent then generated connectors, SQL transformations and report endpoints against that layer, not against raw tables. A metric could not quietly diverge between two reports; it could not diverge at all.

Two-stage review was the governance

Every unit of generated code went through a second agent instructed to adversarially review it — spec drift, permission leaks, dead joins, numeric misreads — and then through a human engineer who owned the merge. Nothing shipped on the agent’s say-so alone. In twelve weeks, 272 requirements went through that gate.

Weekly cohorts, not big bang

Reports were released in weekly cohorts of roughly two dozen, so the controlling team was validating real numbers against hand-run baselines from week three. By week six the hand-run baselines stopped being needed. By week twelve the 0.5 FTE of manual reporting was unassigned.

Services deployed

  • Custom AI Agents (coding agent, adversarial review agent, report runtime)
  • AI-Driven Reporting (semantic layer + 272 governed reports)
  • Knowledge Engineering (requirements catalogue → spec, domain ontology)
  • AI Prototyping Enablement (agent-led build pattern, now standard inside the client)